Centurion Truck Rental

Latest news

Going Electric: An Operator’s Guide to the ZEV Transition

A seven-part guide to taking an SME haulage operation through the zero-emission transition, in the order it actually happens.

Jamie Sands, Author of this series, Head of Solutions at Welch’s Transport and founder of TwentyForty*

Going electric isn’t simply a case of choosing an electric truck. For an operator, the transition involves duty cycles, power, charging infrastructure, commercial considerations, vehicle selection and the practical realities of running the truck every day.

This series takes those questions in order, from the operator’s perspective. It is aimed at SME HGV operators considering electric vehicles without a dedicated sustainability team or consultant on hand to navigate the process.

The central argument running through the series is simple:

This is an energy and operational transition, not a vehicle swap.

The seven-part series covers:

01. You don’t electrify a fleet. You electrify duty cycles.
Which vehicles could realistically go electric now?

02. Phone the network operator before you phone the dealer.
Why your grid connection may be the longest lead item.

03. A charger isn’t a fuel pump.
Understanding charging, infrastructure and managing demand.

04. The price tag is the wrong number.
Looking at whole-life cost rather than simply comparing purchase prices.

05. Buy the truck last.
Choosing the right vehicle for the work, beyond the specification sheet.

06. An electric truck isn’t a diesel with a battery.
What changes when you actually start operating one.

07. The first truck is the hard one.
What the pilot teaches you before you start scaling.

Start with the work and the power. Then choose the truck.

Part 0: Going electric: the truck is the easy part

An operator’s guide to the zero-emission transition. Part 0: start here.

Most operators start in the wrong place. They go to a truck show, sit in a cab, get a quote, and build a business case around the vehicle. Six months later they find out the depot can’t power it, the routes don’t suit it, and the recovery firm can’t lift it off the hard shoulder. The truck was never the problem.

If you’re an SME operator weighing up zero-emission vehicles, this series is the sequence I wish someone had handed me before we put our first electric 42-tonner into service. Not the glossy version. The actual order of operations, the bits that bite, and where the money and the time really go.

Here’s the take, and it runs through everything that follows. The order you do this in matters more than any single decision you make along the way. Get the sequence right and the rest is just work. Get it wrong and you’ll spend a fortune learning it the hard way.

Two things sit at the front, and they’re the two nobody gets excited about. Your duty cycles and your power. What your vehicles actually do all day, and whether your depot can feed an electric one. Everything else depends on those two answers: the vehicle, the chargers, the commercial case, all of it. You can order a truck in an afternoon. A grid connection can take eighteen months. That alone tells you where to begin.

This isn’t a pitch for going electric. Plenty of work doesn’t suit it yet, and pretending otherwise helps no one. It’s a clear-eyed walk through what’s actually involved once you’ve decided to find out whether it works for you. Some of your fleet will be ready for this today. Some won’t be ready for years. The whole point of the exercise is knowing which is which before you spend a penny.

A word on who this is for. If you’ve got a sustainability team, fifty EVs already on the road, and a consultant on retainer, you don’t need it. This is for the operator running a couple of depots on a tight margin who keeps reading that electric is coming and wants to know what it takes in practice. Operator to operator. No jargon, no agenda.

Here’s the road ahead.

  1. Duty cycles. Before you buy anything, work out which of your vehicles can go electric now. The data’s already sitting in your telematics.
  2. Power. The long lead item, and the one operators consistently underestimate. Why you talk to your network operator before you talk to a dealer.
  3. Charging. How many, how fast, and how to manage the load so you don’t trip your supply or get battered on demand charges.
  4. The commercial case. Why the sticker-price comparison is the wrong one, and where total cost of ownership actually lands.
  5. Choosing the vehicle. Matching range and payload to the work, and what to check beyond the spec sheet.
  6. Making it work day to day. Drivers, scheduling, maintenance, and the breakdown problem nobody warns you about.
  7. Running it and scaling. Treating the first truck as a learning platform before you commit to a fleet.

Work through it in that order and you’ll make decisions in the right sequence, with the expensive surprises moved to the front where you can plan for them instead of tripping over them.

Start with the power and the work. The truck is the bit everyone fixates on, and it’s the least of your problems.

*TwentyForty is a Research and Technology Organisation built by operators, for operators. We run collaborative trials, publish operator-sourced evidence, and bring the freight sector’s voice into policy and regulation through our 12 Pillars of Change programme. The Loading Bay is our media platform, telling the real stories of fleet decarbonisation. Born out of Welch Group’s electrification work, everything we do starts with what actually happens at the depot gate.

Other news

Be the first to hear about our latest vehicles, news and deals.

Join the Centurion newsletter